PROJECT

SUBSTATION OF 3 MVA AND NETWORK CONNECTION 13.2Kv AND 34.5Kv

ABI-BAVARIA

LOCATION:

BARRANQUILLA - ATLÁNTICO

DATE:

2024

DESCRIPTIONN

  • Supply, assembly, connection, testing and commissioning of substation and medium voltage lines.
  • Supply, assembly of civil works for pole foundation, panel assembly, transformer and perimeter enclosure.
  • Supply of poles, connections and protection elements for the MV network.
  • Support with network operator for connection to local electrical system and startup.